To edit, add comments or upload photos: Sign In
PowerDot - Système U - Diemeringencharging location
Nearest Address:
8 Rue Paul Paray
Diemeringen
Grand Est
67430
France
Number Of Stations/Bays:
4
Usage:
Public
Operational Status:
Operational
Latitude:
48.938452875752546
Longitude:
7.1908186491339166
OCM Ref: OCM-478366
Network/Operator
Power Dot https://powerdot.fr/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
3 Present
OCM-CN-803432
160 kW
DC
CHAdeMO
Operational
1 Present
OCM-CN-803433
50 kW
DC
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-803434
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
TotalEnergies - Aire de Keskastel
6.01 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Fastned - Aire de Keskastel-Ouest
6.23 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PowerDot - Mairie de Montbronn - Montbronn
7.51 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Villa René Lalique
8.03 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PowerDot - Système U - Sarralbe
8.12 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PowerDot - Super U - Rohrbach-lès-Bitche
8.63 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
IECharge - Hambach
10.19 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Tesla Supercharger Phalsbourg
11.7 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
CHAPITEAUX SERVICE
12.32 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Upload your own photos for this location: Sign In