To edit, add comments or upload photos: Sign In
ایستگاه شارژ صفهcharging location
Nearest Address:
جاده تله کابین
منطقه ۵
استان اصفهان
81739-65711
Iran, Islamic Republic Of
Number Of Stations/Bays:
4
Usage:
Public - Membership Required
Usage Cost:
1600T
Operational Status:
Operational
Latitude:
32.59092750814462
Longitude:
51.656397938953205
OCM Ref: OCM-478406
Network/Operator
تسلا شارژ - teslacharge (IR) https://teslacharge.ir/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
GB-T DC - GB/T 20234.3
Operational
4 Present
OCM-CN-803535
120 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
ایستگاه شارژ فرایبورگ
2.27 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
ایستگاه شارژ پارکینگ نیکبخت
2.64 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ پارکینگ طبقاتی توحید
2.8 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ فرهان (بوستان زمزم)
2.86 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
ایستگاه شارژ سپاهان شهر
2.95 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
ایستگاه شارژ پارکینگ خاقانی
2.98 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ پارکینگ جلفا
3.01 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ پارکینگ زیر سطحی توحید
3.2 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ پارکینگ سجاد
3.42 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Upload your own photos for this location: Sign In