Bio Energy - FAST 90 KW Stazione di Ricarica - Ceccanocharging location
90 kW DC fast charging station - 2 CCS connectors - Open 24/7 - DIrect POS payment - No membership required - Competitive price 0,59 /kWh - Strategic location near A1 Frosinone highway exit - Easy access and commercial services nearby.
Accessible 24/7 with no gate or barrier. Easy access from Via G. Di Vittorio. Located in commercial area near supermarket and services. Clear signage and convenient parking
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - Has recent user verification
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
90 KW Fast Charging station - 2 CCS connectors- Public access 24/7 - Direct POS payment - - No membership required - Strategic location near A1 Frosinone exit.
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Suite Testani
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Volvo M&M Car
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Testani
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Testani Frosinone
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
L'AUTO S.r.l | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
L'Autorent | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX EVA+ Frosinone TurrizianiPetroli CC Le Lame
2
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bar Chiappini - ZapGrid
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Via Bagni Roana
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by BIO ENERGY on 2026-03-03