To edit, add comments or upload photos: Sign In
Artotel Gelora Senayancharging location
Nearest Address:
Artotel Gelora Senayan,
Jl Pintu Satu Senayan
Jakarta Selatan
DKI Jakarta
10270
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Operational Status:
Operational
Latitude:
-6.223441436361668
Longitude:
106.8030105133463
OCM Ref: OCM-479939
Network/Operator
Voltron (Indonesia) https://voltron.id/ +62 8781 0584 499
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-805753
100 kW
DC
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-805754
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
(TERRA CHARGE) FX Sudirman
0.13 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Summitmas Tower 1
Jl. Jenderal Sudirman No.Kav. 61-62, RT.5/RW.3, Senayan, Kec. Kby. Baru
Jakarta Selatan
Jakarta
12190
Indonesia
View
0.23 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Medco Energy Building
0.3 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(iGreen+) Ratu Plaza
0.31 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Shell Pacific Place
0.36 Miles
Public
Operational
Public
Operational
Gedung Bursa Efek Indonesia
0.4 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Equity Tower
0.42 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(STROOM) SCBD Park
0.51 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Senayan City
0.53 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In