To edit, add comments or upload photos: Sign In
FastWay charging location
Nearest Address:
Via Maria Montessori
Modena
MO
Italy
Number Of Stations/Bays:
1
Usage:
Public
Operational Status:
Operational
Latitude:
44.650154
Longitude:
10.916288
OCM Ref: OCM-480556
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 100 out of 100
- User Feedback - Has recent user verification
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Status Unknown
2 Present
OCM-CN-806587
120 kW
DC
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok fino ad 119,9 kW e di fronte alla colonnina troviamo subito un ricco bar con tavoli anche all'aperto. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-fastway-ultra-fast-modena-mo-via-maria-montessori-t45592.html
https://www.forumelettrico.it/forum/colonnina-fastway-ultra-fast-modena-mo-via-maria-montessori-t45592.html Comment by ForumElettrico.it 03/23/2026 10:50:50
Other Charging Locations
There are 9 matching results
FastWay
1
5
0 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hera Emilia Ovest
2
6
0 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera
1
5
0.21 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Agrifer Palazzo dei Musei
1
5
0.23 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enermia Hotel Central Park
1
2
0.23 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Rainusso
1
5
0.24 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Agrifer Berengario
1
5
0.31 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Be Charge IP
1
5
0.32 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Modena Emilia Ovest | EnelX by Hera
2
3
0.32 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2026-03-23
Uploaded by ForumElettrico.it on 2026-03-23
Uploaded by ForumElettrico.it on 2026-03-23
Uploaded by ForumElettrico.it on 2026-03-23
Uploaded by ForumElettrico.it on 2026-03-23