To edit, add comments or upload photos: Sign In
Lebuhraya Pantai Timurcharging location
Nearest Address:
Lebuhraya Pantai Timur
Terengganu
24000
Malaysia
Number Of Stations/Bays:
4
Usage:
Public
Usage Cost:
RM1.8/kwh
Operational Status:
Operational
Latitude:
4.01882115595977
Longitude:
103.31362243812055
OCM Ref: OCM-480608
Network/Operator
Gentari Go (MY) https://www.gentari.com/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
4 Present
OCM-CN-806663
200 kW
DC
1000 V
300 A
Battery powered charger
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Shell LPT 2 Perasing RNR
0.14 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Swiss-Garden Beach Resort Kuantan
8.28 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Royale Chulan Cherating Villa
1
2
9.43 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
El Charge Cherating Lama
9.77 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Tasek Commercial Centre
10.55 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Tasek Commercial Centre
10.55 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
THE KASTURI RESORT CHERATING (Hotel)
12.05 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Gentari @ Proton 3S YS Autoworld
12.09 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BLH ECOENERGY , KUANTAN (Commercial)
12.36 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In