To edit, add comments or upload photos: Sign In
NPD Oamarucharging location
Nearest Address:
1 Indusrtrial Place
Oamaru North
Oamaru
Otago
9494
New Zealand
Number Of Stations/Bays:
15
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
-45.0630545
Longitude:
170.9991674
OCM Ref: OCM-492043
Network/Operator
Zero (Meridian Energy) https://www.meridianenergy.co.nz/for-home/zero
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Unknown
Operational
1 Present
OCM-CN-834398
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 7 matching results
Network Waitaki Eden Street Car Park Oamaru
1
6
2.68 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Oamaru (The Warehouse)
2.75 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Oamaru TOP 10 Holiday Park
3.16 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Blue Commando (2P+E)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Blue Commando (2P+E)
Tyne Street carpark
1
1
3.24 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Oamaru Harbour Tourist Park
3.34 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Blue Commando (2P+E)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Blue Commando (2P+E)
Pen-Y-Bryn
3.64 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Glenavy Waitaki River Motor Camp
11.11 Miles
Operational
Operational
Upload your own photos for this location: Sign In