Enel X IKEAcharging location
Accessibile solo durante gli orari di apertura del negozio.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Raccordo per la A1 Uscita Casoria
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Fast situata nel parcheggio IKEA con accanto le colonnine quick. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-ricarica-ikea-afragola-t21435.html
https://www.forumelettrico.it/forum/colonnine-ricarica-ikea-afragola-t21435.html Comment by ForumElettrico.it 05/09/2022 12:55:00
Rating: 5 out of 5 [ General Comment , Charged Successfully ]Good GPS positioning
Comment by PowerCruiseControl 12/16/2018 09:10:45
Other Charging Locations
There are 9 matching results
Enel X Way
1
2
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way McDonald's
1
1
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way Pineta Comunale
1
2
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Free To X AdS Cittadella Ovest
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Concessionaria AMB Cardito | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lidl Napoli Arpino
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way McDonald's
1
3
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
CPM Carburanti
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Eni
1
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-05-09
Uploaded by ForumElettrico.it on 2022-05-09