Bologna S. Donato, 68 BeChargecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Il parcheggio è quello dell'edicola per cui è tutto un andare e venire di persone, spesso abusivi ma solo per qualche minuto. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-bologna-bo-via-san-donato-68-t14610.html
https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-bologna-bo-via-san-donato-68-t14610.html Comment by ForumElettrico.it 12/19/2020 11:07:04
Other Charging Locations
There are 9 matching results
Hera Giardino Franco Paselli
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eurospin BOLOGNA Pezzana BECHARGE
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX EVA+ Conad Michelino
4
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
LIDL Bologna Via Libia
2
4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive BolognaFiere
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Unicredit Factoring Spa | Driwe
1
2
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Hera Ranzani
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lidl Bologna Serlio
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bologna Rimesse | EnelX
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-12-19
Uploaded by ForumElettrico.it on 2020-12-19
Uploaded by ForumElettrico.it on 2020-12-19
Uploaded by ForumElettrico.it on 2020-12-19