Hera Giardino Franco Pasellicharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
HeraRicarica Pubblica https://heracomm.gruppohera.it/casa/mobilita-sostenibile/ricarica-pubblica 800.087.591
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Di fronte abbiamo un centro commerciale con supermercato, bar, farmacia e qualche negozio. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-hera-12-kw-giardino-franco-paselli-bologna-bo-viale-della-repubblica-21-t28970.html
https://www.forumelettrico.it/forum/colonnina-hera-12-kw-giardino-franco-paselli-bologna-bo-viale-della-repubblica-21-t28970.html Comment by ForumElettrico.it 12/10/2022 10:08:18
Other Charging Locations
There are 9 matching results
Eurospin BOLOGNA Pezzana BECHARGE
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Unicredit Factoring Spa | Driwe
1
2
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Eneldrive BolognaFiere
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bologna S. Donato, 68 BeCharge
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lidl Bologna Serlio
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Ranzani
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Bologna Fiera
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Bologna Mascarella | EnelX
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX EVA+ Conad Michelino
4
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-12-10
Uploaded by ForumElettrico.it on 2022-12-10
Uploaded by ForumElettrico.it on 2022-12-10
Uploaded by ForumElettrico.it on 2022-12-10
Uploaded by ForumElettrico.it on 2022-12-10