To edit, add comments or upload photos: Sign In
Hostal Rte. El Pucherocharging location
Nearest Address:
Calle Real
Castilla-La Mancha
Spain
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
1
Usage:
Private - For Staff, Visitors or Customers
Operational Status:
Operational
Latitude:
38.94850857546419
Longitude:
-2.5367988197425575
OCM Ref: OCM-213201
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CEE 7/4 - Schuko - Type F
Operational
1 Present
OCM-CN-355149
3.7 kW
AC (Single-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Ayto El Bonillo
1
0.28 Miles
Public
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Rest. Miguel Hernández. Munera (Acciona)
6.6 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Munera Piscina Municipal (Acciona)
6.92 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
E.S. Inepealsa Munera
1
7.16 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. Osa de Montiel
1
11.21 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ayuntamiento de Viveros
12.31 Miles
Public
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ayunt. Viveros
12.41 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Taller Hermanos Cabañero
12.43 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Robledo (Acciona)
1
13.87 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In