To edit, add comments or upload photos: Sign In
Ayunt. Osa de Montielcharging location
Nearest Address:
Plaza de la Constitución
Castilla-La Mancha
02611
Spain
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
4
Usage:
Public - Membership Required
Usage Cost:
0,49€/kWh DC - 0,39€/kWh AC
Operational Status:
Operational
Latitude:
38.96265940060232
Longitude:
-2.7445823326587515
OCM Ref: OCM-301021
Network/Operator
Endesa http://www.endesa.es/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-561659
50 kW
DC
500 V
150 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-561660
22 kW
AC (Three-Phase)
CHAdeMO
Operational
1 Present
OCM-CN-575868
50 kW
DC
Type 2 (Socket Only)
Operational
2 Present
OCM-CN-575869
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 6 matching results
Hotel Rural Albamanjon
5.28 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ruidera (Acciona)
1
7.69 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ayto El Bonillo
1
11.15 Miles
Public
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hostal Rte. El Puchero
11.21 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Hotel Rest. Miguel Hernández. Munera (Acciona)
14.45 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Munera Piscina Municipal (Acciona)
14.83 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)