To edit, add comments or upload photos: Sign In
Edison Next Eni Battifollecharging location
Nearest Address:
SS 679
Arezzo
AR
Italy
Number Of Stations/Bays:
1
Usage:
Public
Operational Status:
Operational
Latitude:
43.439092
Longitude:
11.783793
OCM Ref: OCM-474339
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 100 out of 100
- User Feedback - Has recent user verification
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Status Unknown
2 Present
OCM-CN-796064
150 kW
DC
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok fino ad almeno 131 kW e nell'area di servizio troviamo un bar pizzeria aperta tutti i giorno dalle 5:30 alle 20. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-edison-next-high-power-eni-arezzo-ar-ss-679-battifolle-t44991.html
https://www.forumelettrico.it/forum/colonnina-edison-next-high-power-eni-arezzo-ar-ss-679-battifolle-t44991.html Comment by ForumElettrico.it 01/18/2026 18:13:14
Other Charging Locations
There are 9 matching results
Arezzo Supercharger - aperto a veicoli NON TESLA
2
6
0.32 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Zero Spreco NRG1 - ZapGrid
3
1.95 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Conad Ponte A Chiani
1
6
2.26 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Free To X ADS Badia al Pino Ovest
3
9
2.39 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Euronics San Zeno - ZapGrid
2.44 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ADS Badia al Pino Ovest
2.47 Miles
Public
Unknown
Level 1 : Low (Under 2kW)
CEE 3 Pin
Public
Unknown
Level 1 : Low (Under 2kW)
CEE 3 Pin
Free To X AdS Badia al Pino Est
1
3
2.52 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way New Cars
1
4
3.63 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
SUPER A&O AREZZO Pisacane | ENELX
3.98 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2026-01-18
Uploaded by ForumElettrico.it on 2026-01-18
Uploaded by ForumElettrico.it on 2026-01-18
Uploaded by ForumElettrico.it on 2026-01-18
Uploaded by ForumElettrico.it on 2026-01-18